Visual inspection of the Adriatic Bridge across Sava River in Zagreb was performed on 10-13 April 2018. NDT is scheduled for 18-25 April 2018.
Visual inspection of the Adriatic Bridge across Sava River in Zagreb was performed on 10-13 April 2018. NDT is scheduled for 18-25 April 2018.